+86 135 3053 5995
sales@mydled.com(1) procurement of raw materials: the LED lamp procurement cycle is longer, especially imported die, order cycle takes 4-6 weeks;
(2) The production process is complex: subject to the PCB design, production casing, plastic irrigation, adjusting white balance;
(3) strict structural requirements: the general cabinet design, the need to consider the wind, rain, lightning.